Inspection Checklist (8 items)
✅ Before the Inspector Arrives(2) Verify all NEC labels installed ✓ [1] [2] All NEC-required labels and placards must be installed at main panel, disconnects, inverter, and conduit runs before inspection.
Verify fire access pathways ✓ [3] [4] Confirm solar array installation meets fire department access pathway requirements. Inspector will verify setbacks from ridge, hips, and valleys.
🔍 Day-of Inspection(4) Confirm equipment matches plans ✓ [5] [6] Installed equipment (modules, inverter, racking) must match the approved plans. Serial numbers and models should be verifiable.
Test rapid shutdown system ~ [7] [8] Inspector may test the rapid shutdown system to verify it functions correctly per NEC 690.12.
Verify grounding and bonding ✓ [9] [10] Inspector will verify equipment grounding conductors, grounding electrode conductors, and module/racking bonding.
Have approved plans on site ✓ [15] A copy of the approved permit plans must be available on site during inspection. Digital copies on a tablet are typically acceptable.
⚠️ Common Failure Points(2) ! Missing or incorrect NEC labels ✓ [11] [12] Most common fail reason: labels missing, placed incorrectly, or with wrong content. Double-check all label locations against NEC 690.56 before inspection.
! Exposed or improperly secured wiring is a common fail. Ensure all conductors are properly routed, supported, and protected.
Inspection requirements may vary by project. Always confirm specific inspection criteria with your inspector or local AHJ.
Ready to build your permit packet? Answer a few quick questions and we'll generate your personalized checklist, templates, and submission plan for San Diego.
Start Permit Builder No account required to get started