EV Charger Permit Submission Checklist in Spokane, Washington

Understand the requirements, gather the right documents, and generate a submission-ready packet for your ev charger permit in Spokane, Washington.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$85 – $800
Review time
Varies — contact authority
Inspections
3 inspections required
Needs verificationLast verified: Feb 15, 20261 verified source

Limited Data Available

Some information on this page has not been fully verified. We're working to improve data quality. Always verify with Spokane directly.

EV Charger Permit Checklist

Spokane5 required, 0 optional

Forms & Applications(1)

  • Permit ApplicationREQUIRED[1][2]

    Completed permit application form

Plans & Diagrams(2)

  • Site PlanREQUIRED[3][4]

    Plan showing charger location and electrical run

  • Electrical One-Line DiagramREQUIRED[5][6]

    Single-line diagram showing panel, circuit, and EVSE connection

Supporting Documents(2)

  • Equipment SpecificationsREQUIRED[7][8]

    Manufacturer data sheets for EVSE and associated equipment

  • Load CalculationREQUIRED[9][10]

    Electrical panel schedule showing capacity for new circuit

This checklist is for reference only. Requirements may change — always verify with Spokane before submission.

Avoid rejections — generate a submission-ready packet

Get a personalized EV Charger permit packet for Spokane, Washington — tailored to your project.

  • Required forms: Permit Application, and more
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $85–$800 estimated total
  • Step-by-step Spokane Building Permits portal submission guide
  • Inspection prep checklist (3 items)
  • Personalized for your specific project details
Start Permit Builder

No account required · Free to get started

Required Documents

Spokane requires the following documents for this permit application.

R

Permit Application

Completed permit application form

R

Site Plan

Plan showing charger location and electrical run

R

Electrical One-Line Diagram

Single-line diagram showing panel, circuit, and EVSE connection

R

Equipment Specifications

Manufacturer data sheets for EVSE and associated equipment

R

Load Calculation

Electrical panel schedule showing capacity for new circuit

Permit Process

Follow these steps to submit your permit application through Spokane Building Permits.

  1. 1

    Create Account

    Register on the Spokane Building Permits portal.

    You'll need: Email address

  2. 2

    Start Application

    Log in and select the EV Charger permit application.

    You'll need: Login credentials

  3. 3

    Enter Project Details

    Fill in project address, owner information, and system details.

    You'll need: Project address, Owner contact, Contractor license

  4. 4

    Upload Documents

    Upload all required documents per the checklist.

    You'll need: All required documents in PDF format

  5. 5

    Pay Fees and Submit

    Pay applicable fees and submit the application.

    You'll need: Payment method

Fees and Timeline

Fee Breakdown

FeeRangeConfidence
Building/Electrical Permit Fee$170 – $800Estimated
Plan Review Fee$85 – $520Approximate

Fees are estimates and may change. Verify current fees with Spokane.

Inspections Required

Electrical Rough-In

Verify circuit routing and wire sizing

EVSE Installation

Verify charger is installed per manufacturer instructions

Final Electrical

Verify circuit protection, GFCI, and operation

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

City of Spokane Planning and Building Services

Last verified: February 15, 2026

1 source referenced

Official page
Spokane EV Charger Permit Information

Verified February 15, 2026

Fee schedule
Spokane Fee Schedule

Verified February 15, 2026

Portal guide
Spokane Online Permitting Portal

Verified February 15, 2026

Frequently Asked Questions

Do I need a ev charger permit in Spokane?
Yes. Spokane requires a ev charger permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does ev charger permit approval take in Spokane?
Processing times in Spokane vary depending on project complexity and current review volume. The process involves 5 steps. Contact Spokane Development Services for current timelines.
What documents are required for a ev charger permit in Spokane?
Spokane requires 5 documents including Permit Application, Site Plan, Electrical One-Line Diagram, Equipment Specifications, and others. See the full list above for details.
What happens if I build without a ev charger permit in Spokane?
Building without a permit in Spokane can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my ev charger permit submission in Spokane?
Yes. PermitMagic generates a submission-ready packet tailored to Spokane's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a ev charger permit cost in Spokane?
EV Charger permit fees in Spokane typically range from $85 to $800, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Spokane.

Ready to prepare this permit correctly?

Start your ev charger permit plan for Spokane, Washington and generate a submission-ready packet with all required documents and authority references.

Start Permit Plan

No account required · Free to get started

Sources & Citations

All regulatory information on this page is sourced from official government publications. Always verify requirements directly with your local Authority Having Jurisdiction (AHJ) before submission.

  1. [1]City of Spokane Planning and Building ServicesSpokane EV Charger Permit Informationhttps://my.spokanecity.org/permitting/(verified Feb 15, 2026)
  2. [2]City of Spokane Planning and Building ServicesSpokane Fee Schedulehttps://my.spokanecity.org/permitting/(verified Feb 15, 2026)
  3. [3]City of Spokane Planning and Building ServicesSpokane Online Permitting Portalhttps://my.spokanecity.org/permitting/(verified Feb 15, 2026)