ADU Permit Submission Checklist in Arlington, Texas

Understand the requirements, gather the right documents, and generate a submission-ready packet for your adu permit in Arlington, Texas.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$85 – $800
Review time
Varies — contact authority
Inspections
6 inspections required
Needs verificationLast verified: Feb 15, 20261 verified source

Limited Data Available

Some information on this page has not been fully verified. We're working to improve data quality. Always verify with Arlington directly.

ADU Permit Checklist

Arlington6 required, 0 optional

Forms & Applications(1)

  • Permit ApplicationREQUIRED[1][2]

    Completed building permit application form

Plans & Diagrams(3)

  • Site PlanREQUIRED[3][4]

    Plan showing existing structures, proposed ADU, and setbacks

  • Architectural PlansREQUIRED[5][6]

    Floor plans, elevations, and sections of the proposed ADU

  • Utility Connection PlanREQUIRED[9][10]

    Plan showing water, sewer, and electrical connections

Supporting Documents(2)

  • Structural CalculationsREQUIRED[7][8]

    Engineering calculations for foundation and framing

  • Energy ComplianceREQUIRED[11][12]

    Energy compliance documentation per state energy code

This checklist is for reference only. Requirements may change — always verify with Arlington before submission.

Generate your permit packet

Get a personalized ADU permit packet for Arlington, Texas — tailored to your project.

  • Required forms: Permit Application, and more
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $85–$800 estimated total
  • Step-by-step Arlington Building Permits portal submission guide
  • Inspection prep checklist (6 items)
  • Personalized for your specific project details
Start Permit Builder

No account required · Free to get started

Required Documents

Arlington requires the following documents for this permit application.

R

Permit Application

Completed building permit application form

R

Site Plan

Plan showing existing structures, proposed ADU, and setbacks

R

Architectural Plans

Floor plans, elevations, and sections of the proposed ADU

R

Structural Calculations

Engineering calculations for foundation and framing

R

Utility Connection Plan

Plan showing water, sewer, and electrical connections

R

Energy Compliance

Energy compliance documentation per state energy code

Permit Process

Follow these steps to submit your permit application through Arlington Building Permits.

  1. 1

    Create Account

    Register on the Arlington Building Permits portal.

    You'll need: Email address

  2. 2

    Start Application

    Log in and select the ADU permit application.

    You'll need: Login credentials

  3. 3

    Enter Project Details

    Fill in project address, owner information, and system details.

    You'll need: Project address, Owner contact, Contractor license

  4. 4

    Upload Documents

    Upload all required documents per the checklist.

    You'll need: All required documents in PDF format

  5. 5

    Pay Fees and Submit

    Pay applicable fees and submit the application.

    You'll need: Payment method

Fees and Timeline

Fee Breakdown

FeeRangeConfidence
Building/Electrical Permit Fee$170 – $800Estimated
Plan Review Fee$85 – $520Approximate

Fees are estimates and may change. Verify current fees with Arlington.

Inspections Required

Foundation Inspection

Verify foundation per approved structural plans

Framing Inspection

Verify wall, floor, and roof framing

Electrical Rough-In

Verify wiring, panel, and circuit layout

Plumbing Rough-In

Verify supply and drain installation

Insulation

Verify insulation installation per energy code

Final Inspection

Complete inspection of finished ADU

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

City of Arlington Planning and Development Services

Last verified: February 15, 2026

1 source referenced

Official page
Arlington ADU Permit Information

Verified February 15, 2026

Fee schedule
Arlington Fee Schedule

Verified February 15, 2026

Portal guide
Arlington Online Permitting Portal

Verified February 15, 2026

Frequently Asked Questions

Do I need a adu permit in Arlington?
Yes. Arlington requires a adu permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does adu permit approval take in Arlington?
Processing times in Arlington vary depending on project complexity and current review volume. The process involves 5 steps. Contact Arlington Development Services for current timelines.
What documents are required for a adu permit in Arlington?
Arlington requires 6 documents including Permit Application, Site Plan, Architectural Plans, Structural Calculations, and others. See the full list above for details.
What happens if I build without a adu permit in Arlington?
Building without a permit in Arlington can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my adu permit submission in Arlington?
Yes. PermitMagic generates a submission-ready packet tailored to Arlington's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a adu permit cost in Arlington?
ADU permit fees in Arlington typically range from $85 to $800, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Arlington.

Ready to prepare this permit correctly?

Start your adu permit plan for Arlington, Texas and generate a submission-ready packet with all required documents and authority references.