ADU Permit Submission Checklist in Nashville, Tennessee

Understand the requirements, gather the right documents, and generate a submission-ready packet for your adu permit in Nashville, Tennessee.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$85 – $780
Review time
Varies — contact authority
Inspections
6 inspections required
Needs verificationLast verified: Feb 15, 20261 verified source

Limited Data Available

Some information on this page has not been fully verified. We're working to improve data quality. Always verify with Nashville directly.

ADU Permit Checklist

Nashville6 required, 0 optional

Forms & Applications(1)

  • Permit ApplicationREQUIRED[1][2]

    Completed building permit application form

Plans & Diagrams(3)

  • Site PlanREQUIRED[3][4]

    Plan showing existing structures, proposed ADU, and setbacks

  • Architectural PlansREQUIRED[5][6]

    Floor plans, elevations, and sections of the proposed ADU

  • Utility Connection PlanREQUIRED[9][10]

    Plan showing water, sewer, and electrical connections

Supporting Documents(2)

  • Structural CalculationsREQUIRED[7][8]

    Engineering calculations for foundation and framing

  • Energy ComplianceREQUIRED[11][12]

    Energy compliance documentation per state energy code

This checklist is for reference only. Requirements may change — always verify with Nashville before submission.

Generate your permit packet

Get a personalized ADU permit packet for Nashville, Tennessee — tailored to your project.

  • Required forms: Permit Application, and more
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $85–$780 estimated total
  • Step-by-step Nashville Building Permits portal submission guide
  • Inspection prep checklist (6 items)
  • Personalized for your specific project details
Start Permit Builder

No account required · Free to get started

Required Documents

Nashville requires the following documents for this permit application.

R

Permit Application

Completed building permit application form

R

Site Plan

Plan showing existing structures, proposed ADU, and setbacks

R

Architectural Plans

Floor plans, elevations, and sections of the proposed ADU

R

Structural Calculations

Engineering calculations for foundation and framing

R

Utility Connection Plan

Plan showing water, sewer, and electrical connections

R

Energy Compliance

Energy compliance documentation per state energy code

Permit Process

Follow these steps to submit your permit application through Nashville Building Permits.

  1. 1

    Create Account

    Register on the Nashville Building Permits portal.

    You'll need: Email address

  2. 2

    Start Application

    Log in and select the ADU permit application.

    You'll need: Login credentials

  3. 3

    Enter Project Details

    Fill in project address, owner information, and system details.

    You'll need: Project address, Owner contact, Contractor license

  4. 4

    Upload Documents

    Upload all required documents per the checklist.

    You'll need: All required documents in PDF format

  5. 5

    Pay Fees and Submit

    Pay applicable fees and submit the application.

    You'll need: Payment method

Fees and Timeline

Fee Breakdown

FeeRangeConfidence
Building/Electrical Permit Fee$170 – $780Estimated
Plan Review Fee$85 – $507Approximate

Fees are estimates and may change. Verify current fees with Nashville.

Inspections Required

Foundation Inspection

Verify foundation per approved structural plans

Framing Inspection

Verify wall, floor, and roof framing

Electrical Rough-In

Verify wiring, panel, and circuit layout

Plumbing Rough-In

Verify supply and drain installation

Insulation

Verify insulation installation per energy code

Final Inspection

Complete inspection of finished ADU

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

Nashville-Davidson Metropolitan Planning Department

Last verified: February 15, 2026

1 source referenced

Official page
Nashville ADU Permit Information

Verified February 15, 2026

Fee schedule
Nashville Fee Schedule

Verified February 15, 2026

Portal guide
Nashville Online Permitting Portal

Verified February 15, 2026

Frequently Asked Questions

Do I need a adu permit in Nashville?
Yes. Nashville requires a adu permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does adu permit approval take in Nashville?
Processing times in Nashville vary depending on project complexity and current review volume. The process involves 5 steps. Contact Nashville Development Services for current timelines.
What documents are required for a adu permit in Nashville?
Nashville requires 6 documents including Permit Application, Site Plan, Architectural Plans, Structural Calculations, and others. See the full list above for details.
What happens if I build without a adu permit in Nashville?
Building without a permit in Nashville can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my adu permit submission in Nashville?
Yes. PermitMagic generates a submission-ready packet tailored to Nashville's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a adu permit cost in Nashville?
ADU permit fees in Nashville typically range from $85 to $780, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Nashville.

Ready to prepare this permit correctly?

Start your adu permit plan for Nashville, Tennessee and generate a submission-ready packet with all required documents and authority references.

Start Permit Plan

No account required · Free to get started

Sources & Citations

All regulatory information on this page is sourced from official government publications. Always verify requirements directly with your local Authority Having Jurisdiction (AHJ) before submission.

  1. [1]Nashville-Davidson Metropolitan Planning DepartmentNashville ADU Permit Informationhttps://planning.nashville.gov/(verified Feb 15, 2026)
  2. [2]Nashville-Davidson Metropolitan Planning DepartmentNashville Fee Schedulehttps://planning.nashville.gov/(verified Feb 15, 2026)
  3. [3]Nashville-Davidson Metropolitan Planning DepartmentNashville Online Permitting Portalhttps://planning.nashville.gov/(verified Feb 15, 2026)