EV Charger Permit Requirements in Memphis, Tennessee

Understand the requirements, gather the right documents, and generate a submission-ready packet for your ev charger permit in Memphis, Tennessee.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$75 โ€“ $700
Review time
Varies โ€” contact authority
Inspections
3 inspections required
Needs verificationLast verified: Feb 15, 20261 verified source

Limited Data Available

Some information on this page has not been fully verified. We're working to improve data quality. Always verify with Memphis directly.

Permit Requirements (5 items)

5 required

๐Ÿ“‹ Forms & Applications(1)

๐Ÿ“ Plans & Diagrams(2)

๐Ÿ“„ Supporting Documents(2)

Generate your permit packet

Get a personalized EV Charger permit packet for Memphis, Tennessee โ€” tailored to your project.

  • Required forms: Permit Application, and more
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $75โ€“$700 estimated total
  • Step-by-step Memphis Building Permits portal submission guide
  • Inspection prep checklist (3 items)
  • Personalized for your specific project details
Start Permit Builder

No account required ยท Free to get started

Permit Process

Follow these steps to submit your permit application through Memphis Building Permits.

  1. 1

    Create Account

    Register on the Memphis Building Permits portal.

    You'll need: Email address

  2. 2

    Start Application

    Log in and select the EV Charger permit application.

    You'll need: Login credentials

  3. 3

    Enter Project Details

    Fill in project address, owner information, and system details.

    You'll need: Project address, Owner contact, Contractor license

  4. 4

    Upload Documents

    Upload all required documents per the checklist.

    You'll need: All required documents in PDF format

  5. 5

    Pay Fees and Submit

    Pay applicable fees and submit the application.

    You'll need: Payment method

Fees and Timeline

Fee Breakdown

FeeRangeConfidence
Building/Electrical Permit Fee$150 โ€“ $700Estimated
Plan Review Fee$75 โ€“ $455Approximate

Fees are estimates and may change. Verify current fees with Memphis.

Inspections Required

Electrical Rough-In

Verify circuit routing and wire sizing

EVSE Installation

Verify charger is installed per manufacturer instructions

Final Electrical

Verify circuit protection, GFCI, and operation

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

City of Memphis Department of Planning and Development

Last verified: February 15, 2026

1 source referenced

Official page
Memphis EV Charger Permit Information

Verified February 15, 2026

Fee schedule
Memphis Fee Schedule

Verified February 15, 2026

Portal guide
Memphis Online Permitting Portal

Verified February 15, 2026

Frequently Asked Questions

Do I need a ev charger permit in Memphis?
Yes. Memphis requires a ev charger permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does ev charger permit approval take in Memphis?
Processing times in Memphis vary depending on project complexity and current review volume. The process involves 5 steps. Contact Memphis Development Services for current timelines.
What documents are required for a ev charger permit in Memphis?
Memphis requires 5 documents including Permit Application, Site Plan, Electrical One-Line Diagram, Equipment Specifications, and others. See the full list above for details.
What happens if I build without a ev charger permit in Memphis?
Building without a permit in Memphis can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my ev charger permit submission in Memphis?
Yes. PermitMagic generates a submission-ready packet tailored to Memphis's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a ev charger permit cost in Memphis?
EV Charger permit fees in Memphis typically range from $75 to $700, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Memphis.

Ready to prepare this permit correctly?

Start your ev charger permit plan for Memphis, Tennessee and generate a submission-ready packet with all required documents and authority references.

Start Permit Plan

No account required ยท Free to get started