Deck Permit Submission Checklist in Aurora, Colorado
Understand the requirements, gather the right documents, and generate a submission-ready packet for your deck permit in Aurora, Colorado.
Key Facts
- Permit required
- Yes
- Submission method
- Online
- Typical fee range
- $85 – $800
- Review time
- Varies — contact authority
- Inspections
- 4 inspections required
Limited Data Available
Some information on this page has not been fully verified. We're working to improve data quality. Always verify with Aurora directly.
Deck Permit Checklist
Aurora — 5 required, 0 optional
Plans & Diagrams(3)
This checklist is for reference only. Requirements may change — always verify with Aurora before submission.
Generate your permit packet
Get a personalized Deck permit packet for Aurora, Colorado — tailored to your project.
- Required forms: Permit Application, and more
- Pre-filled templates: Permit Cover Sheet
- Fee breakdown: $85–$800 estimated total
- Step-by-step Aurora Building Permits portal submission guide
- Inspection prep checklist (4 items)
- Personalized for your specific project details
No account required · Free to get started
Required Documents
Aurora requires the following documents for this permit application.
Permit Application
Completed building permit application form
Site Plan
Plan showing property boundaries and proposed deck location
Construction Plans
Detailed plans showing framing, footings, and dimensions
Structural Details
Connection details for ledger board, posts, and footings
Property Survey
Survey showing property lines and easements
Permit Process
Follow these steps to submit your permit application through Aurora Building Permits.
- 1
Create Account
Register on the Aurora Building Permits portal.
You'll need: Email address
- 2
Start Application
Log in and select the Deck permit application.
You'll need: Login credentials
- 3
Enter Project Details
Fill in project address, owner information, and system details.
You'll need: Project address, Owner contact, Contractor license
- 4
Upload Documents
Upload all required documents per the checklist.
You'll need: All required documents in PDF format
- 5
Pay Fees and Submit
Pay applicable fees and submit the application.
You'll need: Payment method
Fees and Timeline
Fee Breakdown
| Fee | Range | Confidence |
|---|---|---|
| Building/Electrical Permit Fee | $170 – $800 | Estimated |
| Plan Review Fee | $85 – $520 | Approximate |
Fees are estimates and may change. Verify current fees with Aurora.
Inspections Required
Footing Inspection
Verify footing depth, dimensions, and soil bearing
Framing Inspection
Verify joist size, spacing, ledger attachment, and flashing
Final Inspection
Verify railing height, baluster spacing, and overall completion
Ledger Connection
Verify ledger board attachment meets IRC requirements
Authority Sources
Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.
Verified February 15, 2026
Verified February 15, 2026
Verified February 15, 2026
Frequently Asked Questions
- Do I need a deck permit in Aurora?
- Yes. Aurora requires a deck permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
- How long does deck permit approval take in Aurora?
- Processing times in Aurora vary depending on project complexity and current review volume. The process involves 5 steps. Contact Aurora Development Services for current timelines.
- What documents are required for a deck permit in Aurora?
- Aurora requires 5 documents including Permit Application, Site Plan, Construction Plans, Structural Details, and others. See the full list above for details.
- What happens if I build without a deck permit in Aurora?
- Building without a permit in Aurora can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
- Can PermitMagic help prepare my deck permit submission in Aurora?
- Yes. PermitMagic generates a submission-ready packet tailored to Aurora's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
- How much does a deck permit cost in Aurora?
- Deck permit fees in Aurora typically range from $85 to $800, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Aurora.
Ready to prepare this permit correctly?
Start your deck permit plan for Aurora, Colorado and generate a submission-ready packet with all required documents and authority references.
Start Permit PlanNo account required · Free to get started