ADU Permit Online Portal Guide in Phoenix, Arizona
Understand the requirements, gather the right documents, and generate a submission-ready packet for your adu permit in Phoenix, Arizona.
Key Facts
- Permit required
- Yes
- Submission method
- Online
- Typical fee range
- $110 – $900
- Review time
- Varies — contact authority
- Inspections
- 6 inspections required
Phoenix Building and Safety
Verify before submission5-step online submission process — account registration required[1][2]
Open PortalStep 1: Create Account
[3]Register on the Phoenix Building and Safety portal.
What You Need
- Email address
Common Mistakes
- Using a personal email instead of business email
Portal steps may change without notice. Always confirm the current process at Phoenix's online portal.
Generate your permit packet
Get a personalized ADU permit packet for Phoenix, Arizona — tailored to your project.
- Required forms: Permit Application, and more
- Pre-filled templates: Permit Cover Sheet
- Fee breakdown: $110–$900 estimated total
- Step-by-step Phoenix Building and Safety portal submission guide
- Inspection prep checklist (6 items)
- Personalized for your specific project details
No account required · Free to get started
Required Documents
Phoenix requires the following documents for this permit application.
Permit Application
Completed building permit application form
Site Plan
Plan showing existing structures, proposed ADU, and setbacks
Architectural Plans
Floor plans, elevations, and sections of the proposed ADU
Structural Calculations
Engineering calculations for foundation and framing
Utility Connection Plan
Plan showing water, sewer, and electrical connections
Energy Compliance
Energy compliance documentation per state energy code
Fees and Timeline
Fee Breakdown
| Fee | Range | Confidence |
|---|---|---|
| Building/Electrical Permit Fee | $220 – $900 | Estimated |
| Plan Review Fee | $110 – $585 | Approximate |
Fees are estimates and may change. Verify current fees with Phoenix.
Inspections Required
Foundation Inspection
Verify foundation per approved structural plans
Framing Inspection
Verify wall, floor, and roof framing
Electrical Rough-In
Verify wiring, panel, and circuit layout
Plumbing Rough-In
Verify supply and drain installation
Insulation
Verify insulation installation per energy code
Final Inspection
Complete inspection of finished ADU
Authority Sources
Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.
City of Phoenix Planning and Development Department
Last verified: February 15, 2026
2 sources referenced
Verified February 15, 2026
Verified February 15, 2026
Verified February 15, 2026
Frequently Asked Questions
- Do I need a adu permit in Phoenix?
- Yes. Phoenix requires a adu permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
- How long does adu permit approval take in Phoenix?
- Processing times in Phoenix vary depending on project complexity and current review volume. The process involves 5 steps. Contact Phoenix Development Services for current timelines.
- What documents are required for a adu permit in Phoenix?
- Phoenix requires 6 documents including Permit Application, Site Plan, Architectural Plans, Structural Calculations, and others. See the full list above for details.
- What happens if I build without a adu permit in Phoenix?
- Building without a permit in Phoenix can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
- Can PermitMagic help prepare my adu permit submission in Phoenix?
- Yes. PermitMagic generates a submission-ready packet tailored to Phoenix's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
- How much does a adu permit cost in Phoenix?
- ADU permit fees in Phoenix typically range from $110 to $900, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Phoenix.
Ready to prepare this permit correctly?
Start your adu permit plan for Phoenix, Arizona and generate a submission-ready packet with all required documents and authority references.
Start Permit PlanNo account required · Free to get started